Most colocation providers will not put a price on their website. Some do. This sheet collects every published retail price we could verify, in the operator's own currency with the date we checked it, next to the wholesale per-kW ranges that large deployments are quoted against.

Published rate cards · power + space
67
published prices
37
operators
16
currencies, unconverted
22
wholesale markets, USD/kW
212–472
USD per kW, published US cabinets

Short answer

In our published data a single 1U slot in the US costs USD 59 to 100 a month and a full US cabinet USD 608 to 2,332. Measured per kW, published US cabinet prices run USD 212–472. Wholesale requirements of a few hundred kW are quoted per kW: CBRE's asking ranges run from USD 130 (São Paulo) to USD 475 (Singapore) per kW per month.

Key facts

  • Watt & Rack lists 67 published colocation retail prices from 37 operators in 16 currencies, checked between 26 Sept 2026 and 1 Oct 2026 (data file updated 1 Oct 2026).
  • Published US-dollar colocation prices that state their kW work out at USD 212–472 per kW per month, median USD 364, across 11 prices from 3 operators (as of 1 Oct 2026).
  • CBRE wholesale asking rents across 22 markets run from USD 160 per kW per month in São Paulo to USD 403 in Singapore at the midpoint (H2 2025 – Q2 2026; data as of 1 Oct 2026).
  • 11 cities have a Watt & Rack price sheet, each with at least three published price points (as of 1 Oct 2026).

Published retail prices: 1U slots, racks, cages and per-kW

Every published price in one table: single-U slots, quarter, half and full racks, cages and the few providers that sell by the kilowatt. Prices are monthly list prices in the currency the operator publishes. The per kW column divides the price by the kilowatts the operator states; where a card gives only amps or kVA we leave it blank rather than guess a voltage. Filter by product type, city, currency or metered energy, or search for an operator.

Published retail prices · 67 rows · grouped by currency
OperatorMarketProductPower as publishedPrice / monthPer kW derivedSetupChecked
AUD
RackmillPerth1RU colocation (Equinix PE2)transit add-on $3/Mbps; 2RU=160, 4RU=290, 10RU=5500.24 kW (1A), A+B feedsAUD120500AUD/kW01 Oct 2026
Ransom ITMultiple (14 AU DCs incl. Equinix/NextDC)1RU Basic (semi-managed)Bandwidth: 20 TBfrom-price; 1RU Premium from 1852 power feeds (amps not stated)AUD145—not stated1 Oct 2026
Micron21Melbourne5RU MiniVaultfrom-price, excl. GST; Half rack 20RU 1.92kW = 8000.48 kW (2A @ 240V)AUD200417AUD/kWnot stated1 Oct 2026
RackmillPerthHalf rackFull rack 42U 3kW=2300, 4kW=2500, 6kW=32001.92 kW (8A)AUD1,200625AUD/kW01 Oct 2026
Micron21MelbourneFull rack 48RU EcoRackfrom-price excl. GST; 6kW=2800, 8kW=3800, 10kW=48004.6 kW (19A)AUD2,020439AUD/kWnot stated1 Oct 2026
BRL
MagnoHostSão PauloColocation 1UBandwidth: 50 TB2U=620; Full rack=8000 (300 TB); 20 Tbps anti-DDoS incl.400 WBRL4701,175BRL/kWnot stated1 Oct 2026
CAD
Sucura NetworksToronto (245 Consumers Rd), Montreal1U colocationBandwidth: 10 Gbps fair-share port2U=75, 4U=135not statedCAD45—not stated1 Oct 2026
Sucura NetworksToronto (245 Consumers Rd), Montreal1U colocationBandwidth: 10 Gbps fair-share port1 IPv4 + IPv6, free BGP, DDoS; 2U=75, 4U=1351A included (+$30/A)CAD59—not stated1 Oct 2026
Hive Data CenterMontreal1U server colocationBandwidth: 1 Gbps port, 50 TB/30 IPv4 + /64 IPv6; 2U=129; 5U 500W 150TB=509; 10U 1kW unlimited=758200 W @ 240V, A+B plugsCAD109545CAD/kWnot stated1 Oct 2026
CLP
DCH (Dominios Chile)SantiagoHousing 1U/2U tower+IVA; annual pay = 1 month freenot statedCLP100,000—20,0001 Oct 2026
Hosting.clSantiagoHousing 1U+IVA; 2U=179,900; Tower 4U=199,900; extra IP 9,900not statedCLP159,900—39,9001 Oct 2026
EUR
HOSTKEYAmsterdam (euNetworks)Half rack (23U)Bandwidth: 1 Gbps, unlimited traffic (fair use)3 kW (2 × 16 A PDU); electricity €0.50/kWh meteredEUR500167EUR/kW+ metered energy026 Sept 2026
HOSTKEYAmsterdam (euNetworks)Full rack (48U)Bandwidth: 1 Gbps, unlimited traffic (fair use)Listed as temporarily unavailable for new customers on the check date6 kW (2 × 32 A PDU); electricity €0.50/kWh meteredEUR800133EUR/kW+ metered energy026 Sept 2026
MIRhostingAmsterdamPer kW, unmanagedBandwidth: not itemisedper kW, all-inEUR360/kW360EUR/kWnot stated26 Sept 2026
MIRhostingFrankfurtPer kW, unmanagedBandwidth: not itemisedper kW, all-inEUR380/kW380EUR/kWnot stated26 Sept 2026
MIRhostingAmsterdamPer kW, managed (popular)Bandwidth: not itemisedper kW, all-inEUR410/kW410EUR/kWnot stated26 Sept 2026
GBP
HA HostingSheffieldSingle server (1U–4U)Bandwidth: 1 Gbps port, 25 TB/mo+VAT, month to month84 kWh/mo (0.5 A) included, £0.40/kWh aboveGBP52.5—not stated26 Sept 2026
Fast2HostCambridge1U–5U, fromBandwidth: 1 Gbps port, unmetered commitDual A+B feeds sized per unitGBP55—not stated26 Sept 2026
Fast2HostCambridgeQuarter rack (10U), fromBandwidth: 1 Gbps port, 500 Mbps unmeteredDual 16 A A+BGBP250—not stated26 Sept 2026
Fast2HostCambridgeHalf rack (21U), fromBandwidth: 1 Gbps unmetered, 10 Gbps readyDual 16 A A+BGBP425—not stated26 Sept 2026
Fast2HostCambridgeFull rack (42U), fromBandwidth: 1 Gbps unmetered, 10 Gbps portEx VAT; 16 A draw quoted at £1,119/mo all-in including energyDual 32 A A+BGBP650—not stated26 Sept 2026
HKD
Brilliant Business Centre (BBC)Hong Kong (Tseung Kwan O, TGT DC), Hong Kong (Tseung Kwan O)1U colocationBandwidth: 1 Gbps shared per rack1 fixed IP; 2U/1A=850, 5U/2A=1600, 10U/3A=28000.5A, 1 socketHKD750—not stated1 Oct 2026
Asia HostHong KongHK-1U colocationBandwidth: 100M switch port1 IP; 2U=1300, 1/4 rack=3800; extra IP HK$300/monot statedHKD1,000—1,0001 Oct 2026
Brilliant Business Centre (BBC)Hong Kong (Tseung Kwan O, TGT DC), Hong Kong (Tseung Kwan O)Half rack 22UBandwidth: 1 Gbps shared per rackFull rack 45U 13A = 98006A, 12 socketsHKD5,200—not stated1 Oct 2026
IDR
Host.IDJakarta1U rackmount serverBandwidth: 1 Gbps dedicated local (1:1) + 200 Mbps shared international2U=1,250,000; 4U=2,250,000450 WIDR750,0001,666,700IDR/kWnot stated1 Oct 2026
KlikserverJakartaDedicated 1U single serverBandwidth: 1 Gbps dedicated local (1:1) + 500 Mbps shared international1 IPv4 (/30); micro 1U 100W = 500,000; 2U = 1,500,000450 WIDR1,000,0002,222,200IDR/kW01 Oct 2026
Perwira CloudJakarta (Gedung Cyber)1U Server Enterprise (max 450 W)Bandwidth: 1 Gbps shared local + 20 Mbps shared international1 IPv4, free BGP; low-power 1U = 500,000; 550W = 1,300,000; 750W = 1,600,000450 WIDR1,100,0002,444,400IDR/kWnot stated1 Oct 2026
INR
RackBank DatacentersIndore1U colocation4U 1kVA = 19,520; Half rack 21U 3kVA = 54,000up to 450 WINR7,18416,000INR/kWnot stated1 Oct 2026
JPY
GMO Cloud (Housing)Tokyo1U rack space (rack only)1U with 100 Mbps shared line (avg 3 Mbps) = 27,500; 1/8 rack 4U 100V/5A = 41,800100V / 1.5AJPY11,000—01 Oct 2026
GMO Cloud (Housing)TokyoQuarter rack 8UHalf 17U 100V/20A = 118,800 (setup 55,000); Full 38U = 198,000 (setup 110,000)100V / 10AJPY60,500—27,5001 Oct 2026
MYR
iCore TechnologyCyberjaya (CJ1)1U colocationBandwidth: 300 Mbps2U=450 (150W), 4U=600 (200W), Quarter=1200/500W/setup 300, Half=1800/750W, Full=3300/1500W/setup 1000100 WMYR3003,000MYR/kW2001 Oct 2026
GB Network SolutionsCyberjaya (CJ1)1U rackBandwidth: 1 Gbps shared, unlimited transfer1 IPv40.1 kW, 1 power pointMYR3703,700MYR/kWnot stated1 Oct 2026
Exabytes MalaysiaKuala Lumpur / Cyberjaya1U rack mountBandwidth: 100 Mbps internet access4 IPs; 2U=490.05; Quarter 12U 0.4kW=1197.90; Half 20U 0.7kW=1960.201 power point (kW not stated)MYR381.15—not stated1 Oct 2026
TheGigabitKuala Lumpur (AIMS)Single UBandwidth: 10 Mbps guaranteedfrom-price; 2 IPs; 2U=535, 4U=675 (setup 212), 10U=1365/0.5kVA/20Mbps (setup 530)0.10 kVA, 1 socketMYR395—1061 Oct 2026
NZD
SiteHostAuckland1RU colocationBandwidth: 1 Gbps port, 500 GB international, national includedexcl GST; 2RU=275, 3RU=375, 4RU=450, 5RU=500included (A+B feeds)NZD150—not stated1 Oct 2026
HD (Home Datacentre)Auckland1U PremiumBandwidth: Unlimited, blended 100 Mbps PIR on 1 Gbps copperexcl GST, /29; 2U=190included (free power)NZD175—not stated1 Oct 2026
SiteHostAucklandQuarter rack (10RU)36-month term, excl power/bandwidth/GST; Half 20RU=600, Full 42RU=700not statedNZD500—not stated1 Oct 2026
SGD
Exabytes SingaporeSingapore1U rackBandwidth: 100 Mbps (80% local / 20% intl)annual billing; monthly 191.84; 4 IPs; 2U=2700.125 kW, 1 power pointSGD172.81,382SGD/kWnot stated1 Oct 2026
QUAPESingapore1U server colocationBandwidth: 100 Mbps shared2 IPv4; 2U 0.5kVA=350; 5U 0.8kVA=6800.3 kVA, 1 outletSGD280—not stated1 Oct 2026
Exabytes SingaporeSingaporeQuarter rack 12UBandwidth: 100 Mbps (80/20)Half rack 20U 1kW = 1728.000.75 kW, 4 power pointsSGD1,069.21,426SGD/kWnot stated1 Oct 2026
THB
DatacenterThailand.netBangkok1U serverBandwidth: 1 Gbps network portavg monthly on 1st-year annual billing; 1 IPv4; 2U/1A=4500; Quarter 9U/3A=9500; Half 20U/6A=190000.5A maxTHB2,000—not stated1 Oct 2026
Nine WebBangkok1U colocationBandwidth: Unlimited data transfer, 1 LAN point1 IP; 2U=5000, 5U=11000, 11U=20000not statedTHB3,000—not stated1 Oct 2026
DatacenterThailand.netBangkokFull rack 42UBandwidth: 1 Gbps network port16 IPv412A, 20 outletsTHB38,000—not stated1 Oct 2026
USD
ColoCrossingBuffalo, Chicago, Dallas +7 more1UBandwidth: 100 Mbps included, 1–100 Gbps port1 A / 120 VUSD59—not stated26 Sept 2026
Digi TuruncIstanbulSingle server 1UBandwidth: 1 Gbps port, 10 TB/30 IPv4 + /64; Half rack 20U 5A 30TB=700 (setup 0); Full 40U 10A 100TB=12001AUSD79—301 Oct 2026
Cyber WurxAtlanta (CoreSite AT2)1UBandwidth: 1 Gbps1 A max (shared 30 A / 120 V)USD99—not stated26 Sept 2026
SharktechLos Angeles1-6U colocationBandwidth: 10-100 Gbps port, 300 TBstarting-at price; 1 Gbps port option $69; 10-42U from 792; Denver/Chicago 1-6U from 65200-1200 W (tiered), 1x C13USD99—not stated1 Oct 2026
TheGigabitHong KongSingle UBandwidth: 4 Mbps guaranteed10U=420 (0.7kVA, setup 64); Half rack 21U=682 (1.5kVA, setup 105)0.10 kVA, 1 socketUSD100—321 Oct 2026
Cyber WurxAtlanta (CoreSite AT2)2UBandwidth: 1 Gbps1 A per port (shared 30 A / 120 V)USD129—not stated26 Sept 2026
Cyber WurxAtlanta (CoreSite AT2)Quarter rack (10U)Bandwidth: 1 Gbps8–10 A (shared 30 A / 120 V)USD459—not stated26 Sept 2026
Psychz NetworksDallasHalf cabinet (20U), 1-year termBandwidth: 100 TB/mo, 1 Gbps uplink1.92 kW (20 A / 120 V)USD454236USD/kW026 Sept 2026
Psychz NetworksAshburnHalf cabinet (20U)Bandwidth: 60 TB/mo, 1 Gbps uplink~2 kW (8 A / 120 V or 4 A / 208 V)USD599—026 Sept 2026
Cyber WurxAtlanta (CoreSite AT2)Half rack (20U)Bandwidth: 1 or 10 GbpsDedicated 20 A / 120 VUSD695—not stated26 Sept 2026
ColoCrossingBuffalo, Chicago, Dallas +7 moreHalf cabinet (20U)Bandwidth: 100 Mbps included1.92 kW (20 A / 120 V)USD699364USD/kWnot stated26 Sept 2026
NetdirektIzmir14U rackBandwidth: 1 Gbps port, 30 TB/29 IPv4; 28U 2x16A=1099.99; 42U 3x16A 10Gbps 100TB=1499.9916A @ 230VUSD599.99—not stated1 Oct 2026
Hurricane ElectricFremont (FMT1/FMT2)Full cabinet (42U), promotionalBandwidth: 1 Gbps internet includedPromotion, limit one per customernot specifiedUSD600—not stated26 Sept 2026
Psychz NetworksDallasFull cabinet (locking), 1.92 kWBandwidth: Unmetered, 1 Gbps uplink1.92 kW (20 A / 120 V)USD608317USD/kW50026 Sept 2026
Psychz NetworksAshburnFull cabinet (42U), 1.92 kWBandwidth: Unmetered, 1 Gbps uplink1.92 kW (20 A / 120 V)USD907472USD/kW2,25026 Sept 2026
Psychz NetworksDallasFull cabinet (locking), 4.99 kWBandwidth: Unmetered, 1 Gbps uplink4.99 kW (30 A / 208 V)USD1,058212USD/kW50026 Sept 2026
Cyber WurxAtlanta (CoreSite AT2)Full rack (42U)Bandwidth: 10 Gbps available2–5 kWUSD1,299–1,499—not stated26 Sept 2026
Psychz NetworksAshburnFull cabinet (42U), 2.88 kWBandwidth: Unmetered, 1 Gbps uplink2.88 kW (30 A / 120 V)USD1,344467USD/kW2,25026 Sept 2026
ColoCrossingBuffalo, Chicago, Dallas +7 moreFull cabinet (42U)Bandwidth: 100 Mbps included3.84 kW (2 × 20 A / 120 V)USD1,399364USD/kWnot stated26 Sept 2026
Psychz NetworksAshburnFull cabinet (42U), 3.33 kWBandwidth: Unmetered, 1 Gbps uplink3.33 kW (20 A / 208 V)USD1,563469USD/kW2,25026 Sept 2026
Psychz NetworksAshburnFull cabinet (42U), 4.99 kWBandwidth: Unmetered, 1 Gbps uplink4.99 kW (30 A / 208 V)USD2,332467USD/kW2,25026 Sept 2026
ColoCrossingBuffalo, Chicago, Dallas +7 moreCage (2 × 42U)Bandwidth: 100 Mbps included7.68 kW (80 A / 120 V)USD2,499325USD/kWnot stated26 Sept 2026
MIRhostingNew YorkPer kW, unmanagedBandwidth: not itemisedper kW, all-inUSD360/kW360USD/kWnot stated26 Sept 2026
VND
VNDATAHo Chi Minh City (CMC IDC)1U colocation (Colo CMC IDC)Bandwidth: 100 Mbps domestic / 10 Mbps international1 IPv4; other DC tiers 1,400,000 / 1,500,000500 WVND1,300,0002,600,000VND/kW01 Oct 2026

Rate cards that cover three or more cities with one price list show the first three cities. Taxes are excluded unless the note says otherwise. A missing operator means it does not publish prices, not that it is cheaper or dearer. Metered energy marks prices where electricity is billed per kWh on top, so the per-kW figure is not all-in.

Sources the operator rate-card pages, with check dates

1U and per-U colocation prices

Single-server and small multi-U slots, 35 of the prices above, are the product most people mean by "server colocation". Power at this size is a fraction of a kilowatt, so the per-kW figure looks high: you are mostly paying for the slot, the network port and the IP addresses. Show only per-U slots in the table, or compare full racks on their own.

Wholesale colocation: price per kW by market

Wholesale colocation is leased by committed IT load, quoted in US dollars per kW per month, with energy metered on top. These are asking ranges reported by CBRE for the period H2 2025 – Q2 2026; the requirement size each figure describes is in the note column.

Wholesale asking rent · USD per kW per month · 22 markets
MarketLowMidHighYoYRequirement / note
Singapore330403USD/kW/mo475n/pCBRE asking range
Hong Kong—295USD/kW/mo—n/pQ1 2026 average, up from $270 a year earlier.
Tokyo—280USD/kW/mo—0%Published average; CBRE reports rents stable year over year.
Querétaro250260USD/kW/mo2700%CBRE asking range
Frankfurt235250USD/kW/mo265n/p250–500 kW requirement; midpoint of the published range.
Silicon Valley200238USD/kW/mo275n/p250–500 kW requirement, N+1/Tier III; midpoint of the published asking-rate range; CBRE: record-high rental rates on occupier demand.
Chicago200215USD/kW/mo230+14.7%250–500 kW requirement; midpoint of the published range.
London195213USD/kW/mo230n/p250–500 kW requirement, N+1/Tier III; midpoint of the published asking-rate range; CBRE: rents in Europe’s four major markets rose year-over-year in Q1 2026.
Los Angeles (Southern California)175213USD/kW/mo250n/p250–500 kW requirement, N+1/Tier III; midpoint of the published asking-rate range; CBRE reports the market as “Southern California”.
New York Tri-State190213USD/kW/mo235n/p250–500 kW requirement, N+1/Tier III; midpoint of the published asking-rate range; CBRE: “rates continue to climb”.
Hillsboro (Portland)185205USD/kW/mo225n/p250–500 kW requirement, N+1/Tier III; midpoint of the published asking-rate range.
Santiago190200USD/kW/mo2100%CBRE asking range
Phoenix175195USD/kW/mo215n/p250–500 kW requirement, N+1/Tier III; midpoint of the published asking-rate range.
Atlanta185193USD/kW/mo200+2%250–500 kW requirement, N+1/Tier III; midpoint of the published asking-rate range; CBRE Global 2026: Q1 asking rents +2% year-over-year.
Bogotá150190USD/kW/mo2300%CBRE asking range
Paris175190USD/kW/mo205n/p250–500 kW requirement, N+1/Tier III; midpoint of the published asking-rate range; CBRE: rents in Europe’s four major markets rose year-over-year in Q1 2026.
Sydney—188USD/kW/mo—0%Published average; CBRE reports rents stable year over year.
Amsterdam165180USD/kW/mo195n/p250–500 kW requirement, N+1/Tier III; midpoint of the published asking-rate range; CBRE: rents in Europe’s four major markets rose year-over-year in Q1 2026.
Houston165180USD/kW/mo195n/p250–500 kW requirement, N+1/Tier III; midpoint of the published asking-rate range (CBRE secondary-market table).
Northern Virginia (Ashburn)160173USD/kW/mo185+1.5%CBRE asking range
Dallas–Fort Worth160173USD/kW/mo1850%250–500 kW requirement, N+1/Tier III; midpoint of the published asking-rate range; CBRE Global 2026: Q1 asking rents unchanged year-over-year.
São Paulo130160USD/kW/mo1900%250–500 kW requirement; midpoint of the published range.

n/p = not published. Low and high are the published range; where CBRE gives a single average, only the midpoint is shown. North America as a whole averaged USD 196 per kW (CBRE), with retail racks of 3–5 kW at USD 500–1,500 a month.

Sources the CBRE report behind each market

Methodology

  • What counts: a price an operator publishes on its own website for a colocation product, recorded with the URL and the date we checked it. Quotes, broker estimates and forum posts are excluded.
  • Currency: every price stays in the currency the operator publishes. We do not convert, because a converted number would carry a rate and a date the operator never stated.
  • Derived per kW: price ÷ the kilowatts the operator states. Amps, kVA, ranges ("2–5 kW") and approximations ("~2 kW") are not converted.
  • Wholesale: CBRE asking rents in USD per kW per month, by requirement tier as CBRE reports it. Figures in other currencies or from older reports are listed separately, not mixed in.
  • Freshness: retail cards checked between 26 Sept 2026 and 1 Oct 2026; wholesale data as of 1 Oct 2026. Full detail on the methodology page; retail data as CSV or JSON, wholesale as CSV.

How colocation pricing works

A colocation bill has three parts that matter: power, space and connectivity. Rate cards bundle them in different ways, which is why two prices for "a full rack" can differ by a factor of four and both be fair.

Amps versus kW

Providers in the US often describe power as a circuit: 20 A at 120 V, 30 A at 208 V. Volts times amps gives the circuit's rating in volt-amperes. What you can actually draw continuously is less. Electrical codes such as the US National Electrical Code size branch circuits so that continuous load stays at 80% of the breaker rating, and the published cards in our data follow that rule to the decimal:

Published kW versus circuit rating · from the rate cards above
OperatorCircuit as publishedV × AkW publishedShare
ColoCrossing20 A / 120 V2.4kVA1.92kW80%
ColoCrossing80 A / 120 V9.6kVA7.68kW80%
Psychz Networks20 A / 120 V2.4kVA1.92kW80%
Psychz Networks30 A / 120 V3.6kVA2.88kW80%
Psychz Networks20 A / 208 V4.16kVA3.33kW80%
Psychz Networks30 A / 208 V6.24kVA4.99kW80%

So when a quote says "30 A", ask for the usable kW and whether the figure is per feed. Redundant A+B feeds double the circuits but not the power you may draw: each feed has to carry the full load if the other fails. Outside North America, voltage changes the arithmetic. Tokyo rate cards are written on 100 V circuits, where 10 A is 1 kVA, while other cards in our data, from Melbourne to Izmir and Montreal, state 230–240 V.

Committed versus metered power

Some providers include power in the monthly fee up to the allocation (all-in). Others charge a space-and-capacity fee and meter the energy you actually use. In our data HOSTKEY in Amsterdam meters electricity at EUR 0.50 per kWh on top of its rack fee, HA Hosting in Sheffield includes 84 kWh a month and charges GBP 0.40 per kWh above it, and MIRhosting sells all-in per kW. Wholesale is committed: CBRE's figures cover the reserved capacity and exclude the metered energy, which the tenant pays on top. Metered billing rewards racks that run well below their allocation; all-in billing rewards racks that run close to it.

Cross-connects

A cross-connect is a physical cable from your rack to another customer, a carrier or a cloud on-ramp in the same building. It is billed monthly per connection, usually with a one-time install fee. Not one operator in our dataset publishes a cross-connect price, so it is the line most likely to surprise you. Ask for the monthly and one-time charge per cross-connect, and whether fibre and copper differ.

Setup fees

14 published prices carry a setup fee, 9 state that setup is free and 44 do not say. Where a fee exists it ranges from a fraction of a month to more than two months of service:

Published setup fees · one-time · in the operator's currency
OperatorProductMonthlySetupSetup ÷ monthly derived
DCH (Dominios Chile)Housing 1U/2U towerCLP100,000CLP20,0000.2months
Hosting.clHousing 1UCLP159,900CLP39,9000.25months
Asia HostHK-1U colocationHKD1,000HKD1,0001months
GMO Cloud (Housing)Quarter rack 8UJPY60,500JPY27,5000.45months
TheGigabitSingle UMYR395MYR1060.27months
iCore Technology1U colocationMYR300MYR2000.67months
Digi TuruncSingle server 1UUSD79USD300.38months
TheGigabitSingle UUSD100USD320.32months
Psychz NetworksFull cabinet (locking), 1.92 kWUSD608USD5000.82months
Psychz NetworksFull cabinet (locking), 4.99 kWUSD1,058USD5000.47months
Psychz NetworksFull cabinet (42U), 1.92 kWUSD907USD2,2502.48months
Psychz NetworksFull cabinet (42U), 2.88 kWUSD1,344USD2,2501.67months
Psychz NetworksFull cabinet (42U), 3.33 kWUSD1,563USD2,2501.44months
Psychz NetworksFull cabinet (42U), 4.99 kWUSD2,332USD2,2500.96months

Term discounts

No operator in our dataset publishes a discount schedule for one-, three- or five-year terms. What the cards do show is that term is already priced in. Psychz's cheapest Dallas product is a half cabinet that requires a one-year term. Exabytes Singapore lists a 1U at SGD 172.80 on annual billing against SGD 191.84 billed monthly, about 10% less. Dominios Chile gives one month free on annual payment. SiteHost's Auckland rack prices assume a 36-month term. Treat any longer term as something to negotiate against a written number, not a standard percentage.

Bandwidth and IPs

Small-footprint cards bundle a port, a traffic allowance and a few IP addresses, which is a large part of what a 1U price buys. Larger cards increasingly include a 1 or 10 Gbps port with "unmetered" or fair-use traffic. Compare like with like: a per-kW figure means little if one offer includes unlimited transfer and the other 100 Mbps.

Colocation cost estimator

A quick range for a deployment you describe, built only from the published numbers on this page. Amber labels mark the assumptions; nothing here replaces a quote.

Inputs — yours

kW
kW/rack
qty
USD/mo each

The starting values (10 kW, 5 kW per rack, Dallas, 36 months) are just an example to change. Results are in US dollars because the published USD rate cards are the only retail set large enough to give a range; we do not convert other currencies.

Rack elevation · your inputs

IT load
10.0kW
Cabinets
2× 42U
Per cabinet
5.0kW

Each cabinet is drawn at your density; lit units show how much of its power budget the load uses.

Racks needed arithmetic
—

Your load divided by your density, rounded up.

Retail benchmark / month published assumption
—

Your kW × the median USD price per kW across 11 published cabinet prices from 3 operators (range USD 212–472/kW).

Wholesale benchmark / month published assumption
—

—

One-time setup published
—

Racks × the range of USD cabinet setup fees published by Psychz Networks (USD 0–2,250 per cabinet).

Cross-connects / month your input
—

No cross-connect prices are published in our dataset. Enter a quote you have to include it.

Contract value over term assumption
—

Monthly retail median (plus cross-connects) × months, plus the top of the setup range. No term discount applied.

Assumptions behind these numbers

  • Retail: your deployment is priced at the same rate per kW as the published cabinets. Those prices bundle space, power and some bandwidth.
  • Wholesale: your load is billed per committed kW like the CBRE requirement tier shown. CBRE figures exclude metered energy, which is billed on top and is not estimated here.
  • No term discount: none of the published cards in our data states one, so none is applied.
  • Cross-connects, remote hands, IP transit above what cards include and taxes are not included unless you enter them.

Colocation prices by city

Cities where at least three published price points name the city get their own sheet with local analysis and the facilities in the metro.

Colocation pricing questions

How much does colocation cost per month?

In our published data a single 1U slot in the US costs USD 59 to 100 a month and a full US cabinet USD 608 to 2,332. Measured per kW, published US cabinet prices run USD 212–472. Wholesale requirements of a few hundred kW are quoted per kW: CBRE's asking ranges run from USD 130 (São Paulo) to USD 475 (Singapore) per kW per month.

Is colocation priced per rack or per kW?

Both appear on rate cards, but power drives the price. One Ashburn operator charges almost exactly the same amount per kW across four full-cabinet sizes, and a Bangkok card charges the same amount per amp from a quarter rack to a full rack. Wholesale deals are quoted purely per committed kW.

Why is colocation pricing so hard to find?

Most operators quote individually because power density, term, location and network needs change the price. Only a minority publish rate cards: our dataset holds 67 published prices from 37 operators, mostly smaller providers. Large operators generally do not publish retail prices.

What is usually not included in a colocation price?

Cross-connects, extra power above the allocation, metered energy where billing is metered, remote hands, IP transit beyond the included amount, setup fees and taxes. None of the operators in our dataset publishes a cross-connect price, so ask for it explicitly.

Sources NFPA 70 and the other standards cited in this explainer, plus every rate card and report above

Get quotes against these numbers

Tell us the kW, the space and where. We collect quotes from providers that fit and send them back so you can compare them with the published prices above.

kW
racks

Your request comes to the Watt & Rack team, not to a mailing list. We match the requirement with providers that fit it and reply by email. Need more detail? Use the full request form.See privacy.