One retail operator in our dataset publishes Ashburn cabinet prices, and those prices make the cleanest case we have that a colocation quote is a price for power with the space thrown in.

Ashburn, United States · published prices
5
retail prices for Ashburn
1
operators publishing
160–185
USD/kW/mo wholesale, CBRE
95
facilities, Northern Virginia

Published colocation prices in Ashburn

Ashburn · 5 published prices · USD
OperatorMarketProductPower as publishedPrice / monthPer kW derivedSetupChecked
Psychz NetworksAshburnHalf cabinet (20U)Bandwidth: 60 TB/mo, 1 Gbps uplink~2 kW (8 A / 120 V or 4 A / 208 V)USD599—026 Sept 2026
Psychz NetworksAshburnFull cabinet (42U), 1.92 kWBandwidth: Unmetered, 1 Gbps uplink1.92 kW (20 A / 120 V)USD907472USD/kW2,25026 Sept 2026
Psychz NetworksAshburnFull cabinet (42U), 2.88 kWBandwidth: Unmetered, 1 Gbps uplink2.88 kW (30 A / 120 V)USD1,344467USD/kW2,25026 Sept 2026
Psychz NetworksAshburnFull cabinet (42U), 3.33 kWBandwidth: Unmetered, 1 Gbps uplink3.33 kW (20 A / 208 V)USD1,563469USD/kW2,25026 Sept 2026
Psychz NetworksAshburnFull cabinet (42U), 4.99 kWBandwidth: Unmetered, 1 Gbps uplink4.99 kW (30 A / 208 V)USD2,332467USD/kW2,25026 Sept 2026

Wholesale benchmark · Northern Virginia (Ashburn)

160–185USD/kW/mo · midpoint 173 · year on year +1.5%.

The cabinet is free; the kilowatt is not

Psychz Networks lists four full-cabinet configurations in Ashburn, from 1.92 kW to 4.99 kW. Divide each monthly price by its power allocation and the result barely moves: USD 472, 467, 469 and 467 per kW. The 42U of space is the same in every row. What changes is the circuit, and the price follows the circuit almost to the dollar.

Each full cabinet carries a USD 2,250 one-time setup fee; the roughly 2 kW half cabinet at USD 599 has none. Spread over a 12-month term, that fee adds USD 187.50 a month to the 1.92 kW cabinet, about 21% on top of its USD 907 rate. Over 36 months it falls to USD 62.50 a month, which is the practical argument for a longer term when a provider will not waive setup.

Wholesale sits in a different bracket. CBRE's H1 2026 North America report puts Northern Virginia at USD 160–185 per kW per month for blocks of 10 MW and more, midpoint USD 173, up 1.5% year on year. The retail per-kW figure is about 2.7 times that midpoint. The comparison is not like for like: CBRE quotes committed IT load with metered energy billed on top, while the Psychz cabinets bundle unmetered bandwidth. Still, the gap shows what a small buyer pays for not committing to megawatts.

The metro is deep. Our data lists 95 facilities across Ashburn, Sterling, Manassas and neighbouring towns: 84 operational, 9 under construction and 2 announced, run by 28 operators. Equinix (16) and Digital Realty (15) have the most sites. 49 facilities publish a capacity figure, together 4,146.7 MW.

Who operates in Northern Virginia

Facilities: 84 operational, 9 under construction, 2 announced. Certifications listed: Uptime Tier 2, ISO 27001 42, SOC 2 41, PCI DSS 40 facilities.

Northern Virginia · operators by facility count · top 10 of 28
OperatorFacilitiesPublished capacityWith certifications listed
Equinix16not published14 of 16
Digital Realty15not published15 of 15
NTT Global Data Centers7238.6MW (7 of 7)0 of 7
STACK Infrastructure5875MW (5 of 5)0 of 5
DataBank5261.9MW (5 of 5)0 of 5
CyrusOne5233MW (5 of 5)2 of 5
QTS Data Centers4274MW (3 of 4)1 of 4
Vantage Data Centers3590MW (3 of 3)0 of 3
Csquare3214.8MW (3 of 3)3 of 3
Aligned Data Centers3180MW (2 of 3)3 of 3

Capacity is the operator's published figure where one exists; facilities without one are not estimated.

Buying in Ashburn

The facilities under construction in Northern Virginia are mapped with their published capacity on megawattlas.com.

Sources Ashburn rate cards and the facility dataset

Request colocation quotes in Ashburn

kW